REFERENCES

PREQUALIFICATION FOR THE CAPACITY RANGE OF CONSTRUCTION

In July, we’ve received a prequalification for the capacity range of construction 213-01 for drainage canals work, as well as restoring work on drainage canals.
This includes our area of expertise bridge and tunnel drainage.

Case Study – Reference project 2019 / 2020 / 2021

Austria – Linz, A7m Vöestbrücke

Area of Application:

Bridge dewatering

Special Challenge:

Creation of the execution plans, large variety of the pipelines

Description:

New construction / Restructuring of 16 single factories of steel and concrete construction

Bridge drainage pipelines in steel boxes and on cantilever arms of concrete bridges

Technical Data:

GRP sewer pipe drainage PN1 SN10.000 without sockets

Order Volume:

Call for tender:

ASFINAG

Contractor:

ARGE A7 Vöestbrücke Linz

Case Study – Reference project 2020

Germany – Unna, A44, Talbrücke Lünerner Bach

Area of Application:

Bridge drainage

Description:

Restructuring of a concrete bridge

Pipes on cantilever arms

Technical Data:

Pipes made of stainless steel 1.4401, wall thickness 2mm, without sockets

Mounting made of stainless steel 1.4401, 1.4404/1.4571

Approximately 659 m DN 200 und 300 

Order volume:
Call of tender: Landesbetrieb Straßenbau NRW, Autobahnniederlassung Hamm
Contractor: Hubert Steinbauer GmbH & Co. KG

Case Study – Reference project 2020

Germany – Dresden, A4w/13/17, Restoration of constructions

Area of Application:

Bridge dewatering

Description:

Restructuring of 19 road bridges above highways

Attach and remove pipes on cantilever arms 

Including transport safety

Technical Data:

Pipes made of stainless steel 1.4571, wall thickness 2mm, without sockets

Mounting made of stainless steel 1.4401, 1.4404/1.4571

Approximately 700 m DN 150 und 200

Order Volume:
Call for tender: Landesamt für Straßenbau und Verkehr Dresden
Contractor: Hubert Steinbauer GmbH & Co. KG
Engineering manual!
Contact Us!